eCommerce & Shipping

Zenkraft

Multi-carrier shipping across FedEx, UPS, and 130+ carriers.

Zenkraft
Zenkraft
Two-way
Salesforce
Salesforce
10
build tasks
1
client projects
Two-way
sync direction
Managed package
how it is built
Overview

Zenkraft on Salesforce

Multi-carrier shipping across FedEx, UPS, and 130+ carriers. We have shipped it across 1 client project and 10 build tasks.

The value is that the action happens automatically from the record your team already works in, with the result tracked back in Salesforce.

We deploy the managed package the right way: sandbox first, licenses and permission sets assigned, templates and layouts configured, and automation wrapped around it so it fits your process.

Every Zenkraft build is delivered by a senior Salesforce architect on a fixed price, tested end to end in a sandbox, deployed to your org, and backed by 30 days of hypercare. You own the result: documented, source-controlled, and free of black-box middleware lock-in.

Quick facts

Platform
Zenkraft
Type
Shipping
Direction
Two-way
Objects
Shipment
Best for
Multi-carrier shipping
Why connect

Why connect Zenkraft to Salesforce

What your team actually gets out of the integration.

Everything in one place

Zenkraft data lives in Salesforce, so your team stops switching between apps and works from a single record.

Act without app-switching

Trigger Zenkraft straight from the record your team already works in.

No manual data entry

Automation replaces copy and paste between Zenkraft and Salesforce, cutting errors and admin time.

Built by senior architects

A production-grade build with governance, testing, and support, not a brittle one-off script.

Live in weeks, at a fixed price

A senior architect scopes and ships your Zenkraft integration on a fixed price, usually in two to six weeks.

Owned by you

Documented, deployed to your own org, and yours to keep. No black-box middleware and no lock-in.

Outcomes

What a Zenkraft integration changes

The measurable difference teams see once the data flows on its own, instead of through copy-paste and spreadsheets.

1-click

actions from the record your team already uses

0

app-switching for the everyday workflow

Consistent

execution across the whole team

Auto

status write-back for a clean audit trail

Use cases

Where teams use Zenkraft on Salesforce

The scenarios this integration is built for, including the ones we have already delivered.

Rate-shop across many carriers from one screen

Generate a shipping label on a Salesforce record

Track a shipment back into Salesforce

Generate labels across carriers.

Rate shipments inside Salesforce.

Trigger Zenkraft straight from the Salesforce record your team already works in, with the result written back.

Standardize the action across the team so it happens the same way every time.

Give leadership one dashboard that ties Zenkraft activity to pipeline and revenue.

Onboard new team members faster, because everything about a customer lives on one Salesforce record.

Who it's for

Teams that get the most from Zenkraft on Salesforce

The roles that feel the difference on day one.

SalesCustomer successOperationsSupportSalesforce adminsFounders and CTOs
Ways to connect

Three ways to connect Zenkraft to Salesforce

And which one we recommend for a build like this.

Native / packaged connectorWe recommendiPaaS middlewareCustom Apex + API
Best forStandard needs, fast startMany systems, high volumeBespoke logic, full control
Speed to valueFastestFastModerate
FlexibilityLimited to the connectorHighUnlimited
Ongoing costConnector licensePlatform licenseBuild and maintain
Best whenA supported connector fitsYou integrate several systemsNothing off-the-shelf fits
How it works

How Zenkraft connects to Salesforce

The shape of the integration at a glance. For the full engineering walkthrough with real code, read the technical guide.

the connection at a glancesync active
01Zenkraft
02Managed package
03Salesforce records

Read the full technical guide

Architecture, the step-by-step build with real Apex and DataWeave code, field mapping, security, and the pitfalls we design out. Written for developers and admins.

Open the technical guide
What we built

What we have built with Zenkraft

The Zenkraft multi-carrier shipping package configured for FedEx, UPS and 130+ carriers, with rate and label generation and custom address-source config, deployed across dev and prod sandboxes.

1client projects delivered
10delivery tasks shipped
01

Multi-carrier shipping

Configured the Zenkraft package for rate shopping and label generation across FedEx, UPS and more than 130 carriers.

02

Address config and rollout

Set up custom address-source configuration and deployed the package cleanly across dev and prod sandboxes.

Real components we ship

Zenkraft (zkmulti) packageFedEx / UPS + 130+ carriersRate and label generationCustom address-source configDev and prod deployment
Timeline

What to expect

A typical engagement, from the first call to a monitored go-live.

Phase 1

Discovery and scoping

2 to 4 days

We map requirements, data, and success criteria, and agree a fixed price.

Phase 2

Build in a sandbox

1 to 3 weeks

Authentication, field mapping, and automation for the Zenkraft integration.

Phase 3

Test and UAT

3 to 5 days

Sandbox validation, edge cases, and a parallel run against the live system.

Phase 4

Go-live and hypercare

30 days

Production deployment, training, and monitored support.

FAQ

Zenkraft Salesforce integration FAQs

How do I connect Zenkraft to Salesforce?

We authenticate Zenkraft using the managed package with OAuth, map the fields to your shipment, build the automation, test it in a sandbox, and go live. Most builds run two to six weeks depending on scope.

Is the Zenkraft Salesforce integration two-way?

Yes. Data flows both ways, so a change in Zenkraft or in Salesforce keeps the other current.

Do we need the Zenkraft managed package?

Usually yes, for the fastest and most supported build. We install it in a sandbox first, then configure it and wrap automation around it.

How long does a Zenkraft Salesforce integration take?

Typically two to six weeks, depending on how many objects and edge cases are involved. We scope it up front and quote a fixed price.

How much does a Zenkraft Salesforce integration cost?

Every engagement starts with a free discovery call and a fixed-price estimate, so there are no hourly surprises.

Do you keep our existing data and history?

Yes. We preserve your existing records and reconcile them during setup, so your reporting works from day one.

Which Salesforce objects does the Zenkraft integration use?

Typically the shipment plus related Accounts, and any custom objects your process needs. We map every field during setup.

Can you build it in our sandbox first?

Yes, always. We build and test in a sandbox, then deploy to production via change sets or a CI pipeline, so there is no risk to your live org.

Need a Zenkraft integration done right?

Tell us your setup and where the data breaks. In a free 30-minute call we will map the Zenkraft flow and hand you a clear, fixed-price plan.

Ask me anything